CURRENT & PAST TRACK RECORDS
List of Major pass and present contracts executed.
YEAR 2021 |
|||
NO |
PROJECT |
LOCATION |
WORK DESCRIPTION |
1 |
ARCHITECTURAL WORKS FOR CPP OF KASAWARI PROJECT (Q19J516E) |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
ARCHITECTURAL WORKS |
YEAR 2020 |
|||
NO |
PROJECT |
LOCATION |
WORK DESCRIPTION |
1 |
LPG MOONSOON |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
2 |
ARCHITECTURE WORKS FOR WHP OF KASAWARI PROJECT |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
(ON GOING) |
3 |
INAI KENANGA |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
4 |
FSO GOLDEN STAR |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
5 |
LPG LEVANT |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
6 |
LPG SIROCCO |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
7 |
LPG TANJUNG PIAI 2 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
8 |
MTT KUCHING 2 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
9 |
LNG SOUTHERN CROSS |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
10 |
MT DAYA MAJU |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
11 |
MT ORKIM MERIT |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
12 |
KEJORA SPRING |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
13 |
LNG ARKAT |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
14 |
LNG SERI ALAM |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
15 |
MT ORKIM CHALLENGER |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
16 |
RT STEPEHANIE |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
17 |
KA TUN AZIZAN |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
18 |
SCF MELAMPUS |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
19 |
KEJORA SUTRA |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
20 |
LNG AMADI |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
21 |
LNG PUTERI DELIMA |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
22 |
ORKIM GAS BRILLIANCE |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
23 |
LNG ENUGU |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
24 |
SAPPORO PRINCESS |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
25 |
DANUM 172 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
26 |
ORKIM DISCOVERY |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
27 |
RT CLAIRE |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
28 |
MT ORKIM RELIANCE |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
29 |
HARBOUR RUBY |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
30 |
ICON ALIZA |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
YEAR 2019 |
|||
NO |
PROJECT |
LOCATION |
WORK DESCRIPTION |
1 |
SUPPLY 3 NOS. OF CLERK FOR RAPID PACKAGE 14 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
|
2 |
TERM CONTRACT FOR CIVIL AND STRUCTURAL AND BUILDING AND INFRASTRUCTURE MAINTENANCE AND SERVICES FOR MRCSB FOR A DURATION OF SIX(6) MONTHS WITH OPTION OF EXTENSION UP TO SIX(6) MONTHS (PACKAGE B) |
MALAYSIAN REFINING CO. SDN BHD |
|
3 |
TERM CONTRACT FOR CIVIL MAINTENANCE WORK FOR PRPC UTILITIES AND FACILITIES SDN BHD OPERATIONAL SUPPORT FOR PERIOD OF TWO (2) YEARS WITH AN OPTION TO EXTEND FOR 1 YEAR (RFX 6200237529) |
PRPC UTILITIES AND FACILITIES SDN BHD |
|
4 |
TERM CONTRACT FOR SUPPLY MANPOWER FOR PRPC UTILITIES & FACILITIES SDN BHD OPERATIONAL SUPPORT FOR PERIOD OF TWO (2) YEARS WITH AN OPTION TO EXTEND FOR 1 YEAR (RFX 6200237529) |
PRPC UTILITIES AND FACILITIES SDN BHD |
|
5 |
SUPPLY OF BUND BED SYSTEM, TOILET FLUSHING VALVES AND ELECTRICAL ITEMS FOR MALIKAI EPC TLP, LABUAN SABAH. |
SABAH SHELL PETROLEUM COMPANY LIMITED |
|
6 |
TERM CONTRACT FOR CIVIL MAINTENANCE WORK FOR PRPC UTILITIES AND FACILITIES SDN BHD (FARM- IN) |
PRPC UTILITIES AND FACILITIES SDN BHD |
|
7 |
TERM CONTRACT FOR CIVIL MAINTENANCE WORK FOR PENGERANG POWER SDN BHD |
PENGERANG POWER SDN BHD |
|
8 |
LNG SERI AMANAH |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
9 |
SOC ENDEAVOUR |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
10 |
XPRESS MEGHNA |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
11 |
LNG SERI CEMPAKA |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
12 |
DEEP ORIENT |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
13 |
LNG PUTERI ZAMRUD 1 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
MANPOWER SUPPLY FOR CARGO TANK CLEANING |
14 |
NAGA 5 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
15 |
LPG SMILEY LADY |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
16 |
NAGA 2 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
17 |
GOLD SUN |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
18 |
LNG GASELYS |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
SUPPLY MANPOWER (TANK CLEANING) |
19 |
LNG PUTERI ZAMRUD |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
MANPOWER SUPPLY FOR CARGO TANK CLEANING |
20 |
LNG SERI CAMELLIA |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
21 |
LNG WOODSIDE DONALDSON |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
22 |
MOPM |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
LOADING BAG |
23 |
LNG HYUNDAI UTOPIA |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
24 |
SEMUA GEMBIRA |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
25 |
ICON SOPHIA |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
26 |
ICON LOTUS |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
27 |
MV DANUM 168 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
28 |
LNG PELITA ENERGY |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
MANPOWER SUPPLY CARGO TANK CLEANING |
29 |
LNG SK SPLENDOR |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
SUPPLY HEAVY DUTY SCAFFOLDING BAG & LIFTING BAG |
30 |
HOPES 3000 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
31 |
LNG SERI ANGGUN |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
SUPPLY MANPOWER |
32 |
LNG MADRID SPIRIT |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
SUPPLY MANPOWER |
33 |
LNG GAS DREAM |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORK |
34 |
MT FRONT DEFENDER |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORK |
35 |
MV SILVER SUN |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORK |
36 |
LNG FSU TENAGA 1 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORK |
37 |
DRY DOCK 2 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORK |
38 |
NORMADIC HJELLESTAD |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORK |
39 |
LNG TANJUNG PUTERI 1 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORK |
40 |
LNG SERI BEGAWAN |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORK |
41 |
LNG SERI CEMARA |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
CARPENTRY WORKS |
YEAR 2017-2018 |
|||
NO |
PROJECT |
LOCATION |
WORK DESCRIPTION |
1 |
SUPPLY 3 NOS. OF RIGGER FOR RAPID PACKAGE 14 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
Supply manpower |
2 |
RIGHT-OF-WAY RECTIFICATION WORK KP55.3 LOOP 1 |
PETRONAS GAS BERHAD |
Rectification work |
3 |
EPC OF NEW DOOR INSTALLATION AT SOC LV SWITCHROOM |
PETRONAS GAS BERHAD |
EPC of new door installation work |
4 |
FIRE WATER NETWORK RE-PAINTING AND PROCESS AREA VISUAL MANAGEMENT |
PETRONAS GAS BERHAD |
Fire water re-painting and process area visual management |
5 |
THE PROVISION OF ACCOMMODATION REFURBISHMENT FOR FPSO KIKEH |
MISC BERHAD |
Refurbishment work |
6 |
ARCHITECTURAL WORKS FOR SEPAT-A PROJECT |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
Architectural works |
7 |
FIRE PROOFING RECTIFICATION – JETTY MRCSB |
MALAYSIAN REFINING CO. SDN BHD |
Fire proofing rectification |
8 |
GENERAL MANPOWER FOR OFFICE SERVICES NON-TECHNICAL CLERK |
REGAS TERMINAL (SG.UDANG) |
Supply manpower |
9 |
GENERAL MANPOWER FOR OFFICE SERVICES – 1) LOGISTIC COORDINATOR 2) TECHNIAL DOCUMENTOR |
REGAS TERMINAL (SG.UDANG) |
Supply manpower |
10 |
SUPPLY 3 NOS. OF RIGGER FOR RAPID PACKAGE 14 ( REV. 1) |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
Supply manpower |
11 |
SLOPE MONITORING RECTIFICATION WORK FOR PGB SEGAMAT RO |
PETRONAS GAS BERHAD |
Rectification work |
12 |
PIPE SUPPORT AND REINSTATE SOIL FOUNDATION AT T-71207 |
MALAYSIAN REFINING CO. SDN BHD |
Pipe support and reinstate soil foundation work |
13 |
SOIL INVESTIGATION, UNDERGROUND UTILITIES DETECTION SURVEY, SPOT LEVEL SURVEY AND ELECTRICAL RESISTIVITY IMAGING AT SEREMBAN 2 CITY GATE STATION |
PETRONAS GAS BERHAD |
Soil investigation, underground utilities detection survey, spot level survey and electrical resistivity imaging work |
14 |
INDUSTRIAL HYGIENE SURVEY & SERVICES (ASBESTOS SURVEY, RISK ASSESSMENT AND SAMPLING ACTIVITY) |
PETRONAS CHEMICALS AMMONIA SDN BHD |
Asbestos survey, risk assessment and sampling activity |
15 |
SUPPLY MANPOWER FOR PRPC UTILITIES & FACILITIES SDN. BHD (2 YEAR + 1 YEAR EXTENSION) |
PRPC UTILITIES AND FACILITIES SDN BHD |
Supply manpower |
YEAR 2016 |
|||
NO |
PROJECT |
LOCATION |
WORK DESCRIPTION |
1 |
CKQ PLATFORM
P.O.NO. : PO/PESB/0116/100 |
PIONEER ENGINEERING (OFFSHORE) CONTRACT HOLDER : CARIGALI HESS |
Provision manpower, tools,equipment,material & consumables supply – CKQ Platform tiles replacement |
2 |
PROVISION MANPOWER, TOOLS,EQUIPMENT,MATERIAL & CONSUMABLES SUPPLY – REPAIR ROOFING
P.O.NO. : PO/PESB/0416/051 |
PIONEER ENGINEERING (OFFSHORE) CONTRACT HOLDER : CARIGALI HESS |
Provision manpower, tools,equipment,material & consumables supply – repair roofing
|
3 |
PROVISION OF DETAIL DESIGN, HYGIENE UPGRADE OF CKP KITCHEN AND FOOD STORE,SUPPLY,INSTALL & COMMISSIONING
P.O.NO. : PO/PESB/0416/083 |
PIONEER ENGINEERING (OFFSHORE) CONTRACT HOLDER : CARIGALI HESS |
Provision of detail design, hygiene upgrade of CKP kitchen and food store,supply,install & commissioning
|
4 |
TALISMAN BOA COLD WATER SYSTEM UPGRADE
P.O.NO.: EGT/PO/TML/ABSB/001 |
EMBER GAS TECHNOLOGY SDN BHD (OFFSHORE) CONTRACT HOLDER : REPSOL |
Cold water system upgrade |
5 |
EPCC F12 FACILITIES PACKAGE
S.O.NO.: 3900004960 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. CONTRACT HOLDER : PETRONAS CARIGALI
|
EPCC F12 facilities package |
6 |
LNG PUTERI ZAMRUD |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. CONTRACT HOLDER : MISC |
To carry out carpentry works at various location |
7 |
TO SUPPLY 6 COMPETENT RIGGERS (RAPID)
SO.NO.: 3900004379 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD.
|
Supply manpower |
8 |
TO SUPPLY 5 COMPETENT RIGGERS (RAPID)
SO.NO.: 3900004661 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
Supply manpower |
9 |
TO SUPPLY 5 COMPETENT RIGGERS (RAPID) REV 1
SO.NO.: 3900004661 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD.
|
Supply manpower |
10 |
TO SUPPLY 4 COMPETENT RIGGERS (RAPID)
SO.NO.: 2300009614 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
Supply manpower |
11 |
TO SUPPLY 8 COMPETENT RIGGERS AND 8 SEMI-SKILLED (RAPID)
SO.NO.: 3900005012 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD.
|
Supply manpower |
12 |
ENGINEERING & WORKSHOP BUILDING RENOVATION (CIVIL WORKS) |
PETRONAS PENAPISAN (MELAKA) SDN.BHD. |
Renovation (civil works) |
YEAR 2015 |
|||
NO |
PROJECT |
LOCATION |
WORK DESCRIPTION |
1 |
PCC of BESAR-A WHP TOPSIDE
SO.NO : 3900002984 |
MALAYSIA MARINE HEAVY ENGINEERING SDN.BHD. (MMHE) CONTRACT HOLDER : PETRONAS CARIGALI SDN.BHD. |
Supply and install of architectural bulk items and outfitting
|
2 |
PROVISION OF HOOK-UP&COMMISIONING & TOP SIDE MAINTENANCE SERVICES-TAPIS B (EOR)
PO.NO : IES/KPW/ABSN/SO15-0312 |
INTERGLEN SDN.BHD. CONTRACT HOLDER : SAPURAKENCANA PINEWELL SDN.BHD. |
Provision of manpower, tools & equipment, materials, consumables and supervision for architectural package for Local Equipment Room (LER)
|
3 |
NEW FABRICATION OF ID FAN DUCTING (HOUSING, INLET AND OUTLET).
PO/SO NO:TISB2011-00197 |
MALAYSIA MARINE HEAVY ENGINEERING SDN.BHD. (MMHE)
TECHNO INDAH SDN.BHD. |
New fabrication of id fan ducting (housing, inlet and outlet).
|
4 |
PROVISION OF MANPOWER SUPPLY-10 NOS OF GENERAL WORKER.
PO/SO NO: 3900003723 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD CONTRACT HOLDER: PETRONAS CARIGALI SDN.BHD |
Supply manpower |
5 |
PROVISION OF MANPOWER SUPPLY-2 NOS OF GENERAL WORKER
PO/SO NO: 3900002942 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD CONTRACT HOLDER: SABAH SHELL PETROLEUM COMPANY |
Supply manpower |
6 |
SUPPLY OF SOCKET KEY OF TUBING.
PO. NO: 4700010782 |
FMC WELLHEAD EQUIPMENT SDN.BHD |
Supply of socket key of tubing.
|
7 |
SUPPLY OF PLYWOOD STAND
PO NO : 4700008938 |
FMC WELLHEAD EQUIPMENT SDN.BHD |
Supply of plywood stand
|
8 |
SUPPLY OF HYDRAULIC COUPLER PROTECTOR SUPPLY OF SOCKET KEY OF TUBING
PO NO: 4700008936 |
FMC WELLHEAD EQUIPMENT SDN.BHD
|
Supply of hydraulic coupler protector Supply of socket key of tubing
|
9 |
SUPPLY OF PLATE GLAND
PO NO: 3700003675 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD CONTRACT HOLDER: PETRONAS CARIGALI SDN.BHD |
Supply of plate gland
|
10 |
BELUM TOPSIDE
PO NO: BPS/P-102592/4 |
BOUSTEAD PENANG SHIPYARD SDN.BHD |
Supply and delivery of furniture |
11 |
PROVISION OF MANPOWER, EQUIPMENT, TOOLS, MATERIALS COMSUMABLES TO PERFORM ABOVE GROUND STRUCTURE REHABILITATION AT SELECTED STATION AT SHAH ALAM REGIONAL OFFICE
PO.NO: 4120120712 |
PGB GTR SHAH ALAM REGION CONTRACT HOLDER: PETRONAS GAS BERHAD |
Perform above ground structure rehabilitation |
12 |
MODIFICATION SUPPORT UPSTREAM FLOWOOP
PO.NO: 47996714 |
FMC WELLHEAD EQUIPMENT
FMC SUBSEA PLANT |
Modification support upstream flowoop
|
13 |
SUPPLY ISS HANDING TOOLS
PO.NO:4700020852 |
FMC WELLHEAD EQUIPMENT
FMC SUBSEA PLANT |
Supply ISS handing tools
|
14 |
SUPPLY EH5 HYDRAULIC COUPLER PROTECTOR
PO.NO:4700029449 |
FMC WELLHEAD EQUIPMENT
FMC SUBSEA PLANT |
Supply EH5 hydraulic coupler protector
|
15 |
SUPPLY M/S 8 TON SUPPORT
PO.NO:4700033680 |
FMC WELLHEAD EQUIPMENT
FMC SUBSEA PLANT |
Supply m/s 8 ton support
|
16 |
SUPPLY EH5 STAND ASSEMBLY
PO.NO:4700042722 |
FMC WELLHEAD EQUIPMENT
FMC SUBSEA PLANT |
Supply EH5 stand assembly |
17 |
SUPPLY 6-10K TORUS III MASTER HUB JIG SUPPLY 12-10K TORUS III MASTER HUB JIG
PO.NO:4700042720 |
FMC WELLHEAD EQUIPMENT
FMC SUBSEA PLANT |
Supply 6-10K TORUS III MASTER HUB JIG Supply 12-10K TORUS III MASTER HUB JIG
|
18 |
SUPPLY STAINLESS STEEL ROUND COVER SUPPLY STAINLESS STEEL HALF COVER
PO.NO:4700054195 |
FMC WELLHEAD EQUIPMENT
FMC SUBSEA PLANT |
Supply stainless steel round cover
Supply stainless steel half cover
|
19 |
SUPPLY LOW TORQUE TEST PLUG ADAPTER
PO.NO: 4700081470 |
FMC WELLHEAD EQUIPMENT
FMC SUBSEA PLANT |
Supply low torque test plug adapter
|
20 |
SUPPLY SOCKET KEY OF TUBING
PO.NO: 4700082841 |
FMC WELLHEAD EQUIPMENT
FMC SUBSEA PLANT |
Supply socket key of tubing
|
21 |
SUPPLY PIPING MATERIAL
PO.NO: 3700005272 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
Supply piping material
|
22 |
FPMC FORMOSAPETRO GIANT
PO.NO: 3800001960 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
Carpentry work
|
23 |
LNG-PUTERI DELIMA |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
Provide skill manpower, necessary tools consumable c/w supply material to fabricate new chamber ladder for cargo tank |
24 |
PUTERI NILAM
PO. NO: 3600002769 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
Heavy duty canvas bag
|
25 |
MAMPU 1/114M0094
SO.NO: 3800000841 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD.
|
Fabricate and supply wooden for laydown area
|
26 |
SEA BASE ALU-ALU
SO.NO: 3800000241 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD.
|
Carpentry – outfitting
|
27 |
OUTFITTING MT NEW CONFIDENCE
SO.NO: 3800001478 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
Carpentry – outfitting Mt new confidence
|
28 |
NAUTICA TEMBIKAI
SO.NO: 380000023 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD.
|
Carpentry
|
29 |
NAGA 2
SO.NO:3800001431 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD.
|
Carpentry
|
30 |
REUPHOLSTERY WORKS NEW CHAMPION
SO.NO: 3800001031 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD.
|
Carpentry
|
31 |
LNG PUTERI DELIMA
SO.NO: 3800001328 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD.
|
Carpentry
|
32 |
LNG PUTERI INTAN
SO.NO: 3800001199 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD.
|
Ccs, fabricate loading bag
|
33 |
LNG PUTERI DELIMA
SO.NO: 3800001183 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD.
|
Scaffolding
|
34 |
LNG PUTERI DELIMA
SO.NO: 3800001198 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD |
Cargo containment system
|
35 |
LNGC SERI BAKTI
SO.NO: 3800000600 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD.
|
To provide competent manpower and equipment to carry out carpentry works |
36 |
SK SPLENDOR
PO.NO: 3600001232 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD.
|
To supply canvas bag
|
37 |
GEMIA
SO.NO: 3800000328 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD.
|
Carpentry
|
38 |
FSO CENDOR
SO.NO: 3800000781 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD.
|
To carry out accommodation protection covering on board
|
39 |
BULL SULAWESI
SO.NO: 3800000374 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD.
|
Carpentry
|
40 |
LNG SK SPLENDOR
SO.NO: 3800000783 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
Fabricate new loading bag and modification pf hatch canvass
|
41 |
FSO CENDOR MARINE
SO.NO:3900003349 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD.
|
Additional service hatch for fire dampers
|
42 |
GLOBAL IRIS
SO.NO: 3800000209 |
MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD. |
Provide competent manpower to carry out carpentry works |
YEAR 2014 |
|||
NO |
PROJECT |
LOCATION |
WORK DESCRIPTION |
1 |
MALIKAI
SO.NO:390000001189(REV.5) |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT SABAH SHELL PETROLEUM COMPANY |
Fabrication, installation, testing and mechanical completion of architectural bulk item items and outfitting
|
2 |
SK316
LA.NO: 5940-0000-CS-3623-120_AMD.0 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT JOINT VENTURE OF TECHNIP AND MMHE |
Architecture and plumbing works
|
3 |
LUNDIN PETROLEUM
PO.NO:10013218-1 |
TTHE FABRICATORS SDN.BHD. CLIENT LUNDIN PETROLEUM |
Architectural installation
|
4 |
SK316
WO.NO: 001 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT JOINT VENTURE OF TECHNIP AND MMHE |
Architecture and plumbing works
|
5 |
SK316
WO.NO: 002 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT JOINT VENTURE OF TECHNIP AND MMHE |
Architecture and plumbing works
|
6 |
MALIKAI TOPSIDE
SO.NO:390000001187(REV.2) |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT SABAH SHELL PETROLEUM COMPANY |
Supply and delivery of architectural bulk items and outfitting
|
7 |
KINABALU TOPSIDE
SO.NO: 3900002293 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT PETRONAS CARIGALI SDN.BHD |
Additional cost due to various SI
|
8 |
BERTAM TOPSIDE
PO.NO: 10010627-1 |
TTHE FABRICATORS SDN.BHD. CLIENT LUNDIN PETROLEUM |
Architectural supply and installation
|
9 |
FABRICATION OF KBB TOPSIDE (BOAQ)
SO.NO: 2200014369 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT KPOC |
Fabrication and installation of drilling cutting chute and food waste chute
|
10 |
SEA BASE ALU-ALU
SO.NO: 3800000241 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT CLIPPER COPENHAGEN |
Carpentry-permanent ballast
|
11 |
HYUNDAI COSMOPIA
SO.NO: 114M0075-00028(1) |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT MARINE BUSINESS UNIT |
Carpentry work
|
12 |
MT GANDINI
SO.NO: 114M0080-00007 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT MARINE BUSINESS UNIT |
Carpentry work |
13 |
PERMAS PROJECT
PO.NO:10011541-1 |
TTHE FABRICATORS SDN.BHD. CLIENT MURPHY
|
To supply and deliver toilet at ipf deck
|
14 |
MODIFY RISER HATCH COVER FOR 10” RISER
SO.NO: 2200014547 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT KPOC |
To modify riser hatch cover for 10” riser
|
15 |
KBB TOPSIDES
SO.NO: 2200014522 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT KPOC |
Fabricate spreader bar for caissons installation offshore
|
16 |
SUBCONTRACT REMAINING STRUCTURAL WORKS
SO.NO: 2200014506 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT KPOC |
Structural works |
17 |
BERTAM PROJECT
PO.NO: 1000431-2 |
TTHE FABRICATORS SDN.BHD. CLIENT LUNDIN PETROLEUM |
To supply and deliver portable toilet |
18 |
KPOC
SO.NO: 2200014378 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT KPOC |
Transverse beam lowering
|
19 |
GEMUSUT KAKAP
PO.NO: 3700000105 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT MISC / SABAH SHELL PETROLEUM COMPANY |
To supply temporary toilet
|
20 |
GLOBAL IRIS
SO.NO: 3800000209 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT GLOBAL IRIS |
Provide competent manpower to carry out carpentry works
|
21 |
SK316 CPP TOPSIDE
SO.NO: 3900002599 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT PETRONAS CARIGALI SDN.BHD |
Supply 2 nos. qc supervisor
|
22 |
FABRICATION OF KBB TOPSIDES (BOAQ)
SO.NO: 2200014106 (Rev.5) |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT KPOC |
Manpower supply
|
23 |
FABRICATION OF KBB TOPSIDE
SO.NO: 2200014488 (Rev.1) |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT KPOC |
Manpower supply
|
24 |
MALIKAI
SO.NO: 3900001399 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT JOINT VENTURE OF TECHNIP MMHE |
To supply manpower for WPQT of piping (riser)
|
25 |
KPOC SO.NO: 2200014980 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT KPOC |
To supply manpower for pre-commissioning and commissioning activities |
26 |
KPOC SO.NO: 2200014379 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT KPOC |
Manpower supply
|
27 |
FABRICATION OF KBB TOPSIDE (BOAQ)
SO.NO: 2200014294 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT KPOC |
Manpower supply for piping activities
|
28
|
FABRICATION OF KBB TOPSIDE (BOAQ)
SO.NO: 2200014288 (Rev.1) |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT KPOC |
Manpower supply
|
29 |
FABRICATION OF KBB TOPSIDE (BOAQ)
SO.NO: 2200014289 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT KPOC |
Manpower supply for mechanical works
|
30 |
LNG SERI ANGKASA
SO.NO: 3800000253 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT MARINE BUSINESS UNIT |
Wooden protection
|
31 |
SERI ANGKASA
SO.NO: 3800000139 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT MARINE BUSINESS UNIT |
Scaffolding loading canvas bag
|
32 |
FPSO CENDOR MARINE
SO.NO: 3900001380 |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT MISC |
Sealant compound installation
|
33 |
LPG GAS INDONESIA
SO.NO: 114M0064-00014(1) |
MALAYSIAN MARINE AND HEAVY ENGINEERING SDN.BHD. CLIENT MARINE BUSINESS UNIT |
Carpentry
|
34 |
MACHINING FOR ALUMINIUM TUBING CLAMP
PO.NO:47948150 |
FMC WELLHEAD EQUIPMENT SDN BHD CLIENT FMC |
Machining for aluminum tubing clamp
|
35 |
MODIFICATION & ADDITIONAL LIFTING PLATE OF 3 SET GV STAND
PO.NO: 47932582 |
FMC WELLHEAD EQUIPMENT SDN BHD CLIENT FMC |
Modification & additional lifting plate of 3 set gv stand
|
36 |
SUPPLY 1 NOS ALUMINIUM PIPE CLAMP
PO.NO: 47920840 |
FMC WELLHEAD EQUIPMENT SDN BHD CLIENT FMC |
Supply 1 nos.aluminum pipe clamp
|
37 |
FABRICATION STAND SUPPORT
PO.NO: 47883741 |
FMC WELLHEAD EQUIPMENT SDN BHD CLIENT FMC |
Fabrication stand support
|
YEAR 2013 |
|||
NO |
PROJECT |
LOCATION |
WORK DESCRIPTION |
1 |
EPCC OF SERENDAH ACCOMODATION (SN-AA) TOPSIDE FACILITIES
SO.NO:C12003-ME-578-13VVH |
KENCANA HL SDN. BHD. CLIENT OBU
|
Accommodation topside facilities |
2 |
ENERGY PRODUCER 6
SO.NO: 113M0008-00099(1) |
MALAYSIA MARINE AND HEAVY ENGINEERING CLIENT MARINE BUSINESS UNIT |
Carpenter for living quarters
|
3 |
F14DR-A TOPSIDE & F14/F29 PROCESS MODUL
VO.NO: 312M382L-00462 |
MALAYSIA MARINE AND HEAVY ENGINEERING CLIENT SHELL |
Additional louvers wall at helideck framing plan
|
4 |
F14DR-A TOPSIDE & F14/F29 PROCESS MODUL
VO.NO: 312M382L-00584 |
MALAYSIA MARINE AND HEAVY ENGINEERING CLIENT SHELL |
Additional cost due to various SI
|
5 |
DAMAR –A PLATFORM (TOPSIDE)
PO.NO: 312M379H-00176 (2) |
MALAYSIA MARINE AND HEAVY ENGINEERING CLIENT EXXONMOBIL |
Carpenter for living quarters
|
6 |
FABRICATION OF KBB TOPSIDES
SO.NO: 2200014157 |
MALAYSIA MARINE AND HEAVY ENGINEERING CLIENT KPOC |
Fabrication of topsides |
7 |
F14DR-A TOPSIDE & F14/F29 PROCESS MODUL
VO.NO: 312M382L-00542 |
MALAYSIA MARINE AND HEAVY ENGINEERING CLIENT SHELL |
Additional works due to various SI
|
8 |
F14DR-A TOPSIDE & F14/F29 PROCESS MODUL
VO.NO: 312M382L-00539 |
MALAYSIA MARINE AND HEAVY ENGINEERING CLIENT SHELL |
To supply and apply choke fast orange compound
|
9 |
AMPA-9 HP COMPRESSOR MODULE PROJECT EPC
SO.NO: C110018-SO-075 |
KENCANA HL SDN BHD CLIENT OFFSHORE BUSINESS UNIT |
Supply and install underlayment Deckrete Latex on LCR roof (HP-98/99)
|
10 |
F14DR-A & F14/F29
SO.NO:312M382L-00283 |
MALAYSIA MARINE AND HEAVY ENGINEERING CLIENT SHELL |
Mechanical works : Fabrication & installation |
11 |
FABRICATION OF KBB TOPSIDES
SO.NO: 2200014276 |
MALAYSIA MARINE AND HEAVY ENGINEERING CLIENT KPOC |
Manpower supply |
12 |
FABRICATION OF KBB TOPSIDES
SO.NO: 2200014106 |
MALAYSIA MARINE AND HEAVY ENGINEERING CLIENT KPOC |
Fabrication of KBB topsides |
13 |
MOPU H25012
SO.NO: C11/025(H2)-SO-012 RH |
KENCANA HL SDN BHD CLIENT OBU |
General cleaning works
|
14 |
TAPIS A PLATFORM
SO.NO: 8017-KL2-PSR-0837 |
SHAPADU ENERGY & ENGINEERING SDN BHD CLIENT EXXONMOBIL |
Supply specialist teams for upper riser heavy walled installation
|
15 |
DAMAR-A PLATFORM (TOPSIDE)
VO.NO: 312M379H-00538 |
MALAYSIA MARINE AND HEAVY ENGINEERING CLIENT EXXONMOBIL |
Piping manpower supply
|
16 |
DAMAR-A PLATFORM (TOPSIDE)
SO.NO: 312M379H-00428 |
MALAYSIA MARINE AND HEAVY ENGINEERING CLIENT EXXONMOBIL |
Piping manpower supply
|
17 |
KPV BADANG
SO.NO: C11/025-SO-018 RH/13 |
KENCANA HL SDN BHD CLIENT OFFSHORE BUSINESS UNIT |
Supply manpower
|
18 |
SUPPLY AND DELIVER WORK BENCHES
SO.NO: 312M382L-00544 |
MALAYSIA MARINE AND HEAVY ENGINEERING CLIENT SHELL |
Supply and deliver work benches
|
19 |
GV STAND MODIFICATION
PO.NO: 47703076 |
FMC WELLHEAD EQUIPMENT SDN BHD CLIENT FMC |
GV Stand modification
|
20 |
SUPPLY MOLD PER DRAWING
PO.NO: 476998808 |
FMC WELLHEAD EQUIPMENT SDN BHD CLIENT FMC |
Supply mold per drawing |
21 |
8 TON SUPPORT STAND
PO.NO: 47693496 |
FMC WELLHEAD EQUIPMENT SDN BHD CLIENT FMC |
Supply 8 ton support stand
|
22 |
SUPPLY GV STAND
PO.NO: 47679504 |
FMC WELLHEAD EQUIPMENT SDN BHD CLIENT FMC |
Supply GV stand
|
23 |
LNGC AQUARIUS
SO.NO:113M0058-00045 |
MALAYSIA MARINE AND HEAVY ENGINEERING CLIENT MBU |
CARPENTRY
|
24 |
LNGC AQUARIUS
SO.NO: 113M0058-00037 |
MALAYSIA MARINE AND HEAVY ENGINEERING CLIENT MBU |
Refurbishment of 2 nos. x 40’ container
|
25 |
FSPO CENDOR MARINE
SO.NO: 110S0011-01091 |
MALAYSIA MARINE AND HEAVY ENGINEERING CLIENT MBU |
Miscellaneous cabin works of 40’ container
|
26 |
MT SCORPIUS
SO.NO: MOL12-13/022 |
M3NERGY OFFSHORE LTD CLIENT MBU |
Provision of services for asbestos analysis
|
27 |
FPSO CENDOR MARINE
SO.NO:110S0011-01000 |
MALAYSIA MARINE AND HEAVY ENGINEERING CLIENT MISC |
Laydown area &shipname
|
28 |
SUPPLY OF JACK C20-50S 20 TON 50MM STROKE
PO.NO: 47776304 |
FMC WELLHEAD EQUIPMENT SDN BHD CLIENT FMC |
Supply of jack c20-50s 20 ton 50mm stroke
|
29 |
SUPPLY HARDWOOD
PO.NO: 3100031157 |
MALAYSIA MARINE AND HEAVY ENGINEERING CLIENT MBU |
Supply hardwood
|
30 |
SUPPLY AND INSTALL CONTAINER WINDOW
PO.NO:S20130095 |
WILLTECH ASIA PTE LTD CLIENT MBU |
Supply and install container window
|
YEAR 2012 |
|||
NO |
PROJECT |
LOCATION |
WORK DESCRIPTION |
1
|
DHIRUBHAI DEEPWATER KG2 (TRANSOCEAN DRILLING SB)
|
WILLTECH ASIA PTE. LTD. (JOHOR PORT) |
Supply Manpower & Material for Flooring Works for Drill Cabin (DOGHOUSE) Project
Removed rubber stud tile from Drillers Cabin A, Drillers Cabin B &Cyberbase Operator Station.
Removed old glue with scrapper, supplied and renewed with new rubber stud tiles. |
2 |
KINABALU CENTRAL PROCESSING PLATFORM (PETRONAS CARIGALI) |
MMHE |
Supply, fabrication, installation, testing & pre-commissioning works - - Architectural for Living Quarters.
Piping/plumbing for Living Quarters Variation work |
|
|||
3 |
F13K (SARAWAK SHELL BERHAD ) |
KENCANA FABRICATION YARD |
Architectural Works
|
4 |
E8K (SARAWAK SHELL BERHAD) |
KENCANA FABRICATION YARD |
Architectural Works |
5 |
LQ-B193 PROCESS PLATFORM (NATURAL GAS CORP, LTD, INDIA) |
HERTEL (SIME DARBY ENGINEERING SDN BHD YARD) |
Installation of the complete Piping and Plumbing System
Architectural outfitting works
Supply and install (wall, floor, insulation , furniture and handrail) |
6 |
SUNBORN BARCELONA (SUNBORN) |
BOUSTED YARD, LUMUT |
MANPOWER SUPPLY |
7
|
GUMUSUT-KAKAP PROJECT (SABAH SHELL PETROLEUM CO.) |
MMHE (OBU) |
Structural Steel Works for West Module |
8 |
WEST DESARU MOPU EPCIC (PETROFAC E & C SDN. BHD.) |
KENCANA FABRICATION YARD |
Architectural Works
|
9 |
AMPA-09 HP COMPRESSION MODULE (BRUNEI SHELL PETROLEUM) |
SAPURA KENCANA PETROLEUM YARD |
Architectural Works
|
10 |
MOPU H2504 (KENCANA) |
SAPURA KENCANA PETROLEUM YARD |
Cleaning Work |
11 |
MT SCORPIUS (M3NERGY) |
LABUAN SHIPYARD |
Survey Asbestos |
YEAR 2011 |
|||
NO |
PROJECT |
LOCATION |
WORK DESCRIPTION |
1
|
FPSO CENDOR PHASE II (PETROFAC) |
MMHE |
Modification Works for upgrading FPSO Cendor PMT Office |
2 |
MOPU (PETROFAC) |
KENCANA FABRICATION YARD |
Architectural Works for Sepat Early Production System |
3 |
PM318 PUTERI PIPELINE & PRODUCTION RESTORATION (NEWFIELD, PETRONAS) |
KENCANA FABRICATION YARD |
Architectural Works
|
YEAR 2009-2010 |
|||
NO |
PROJECT |
LOCATION |
WORK DESCRIPTION |
1 |
WEST BELUMUT (NEWFIELD) |
KENCANA FABRICATION YARD |
Architectural works |
2 |
CPDR-A TOPSIDES (SARAWAK SHELL BERHAD) |
KENCANA FABRICATION YARD |
Supply of manpower, materials, supervision, tools, equipment, fitting and consumables for Architectural works |
3 |
F23R-A (SARAWAK SHELL BERHAD) |
PfcE (TELOK RAMUNIA FABRICATION YARD) |
To fabricate and supply one (1) unit local make portable toilet as per client specification. |
4 |
F23R-A TOPSIDES (SARAWAK SHELL BERHAD) |
PfcE (TELOK RAMUNIA FABRICATION YARD) |
Provision of manpower, tools consumables, equipment for mechanical works |
5 |
PLUTO LNG OFFSHORE PLATFORM TOPSIDES (WOODSIDE BURRUP PTE LTD) |
TELOK RAMUNIA FABRICATION YARD |
Mechanical Installation Work |
6 |
TANGGA BARAT CENTRAL PROCESSING PLATFORM – A (PETRONAS CARIGALI) |
MMHE |
Fabrication, installation, testing & pre-commissioning works - - Architectural for Living Quarters. - - Piping/plumbing for Living Quarters
Additional Repair works |
|
|||
7 |
MOPU 256 (PETROFAC) |
MMHE |
Architectural Work |
YEAR 2008 |
|||
NO |
PROJECT |
LOCATION |
WORK DESCRIPTION |
1 |
NAGA – 1 ( UJD ) |
MMHE (SHIPREPAIR DIVISION) |
Removal asbestos. |
2 |
6 - MAN TEMPORARY LIVING QUATERS (SARAWAK SHELL BERHAD) |
ACTUAL BUILDER SDN. BHD - WORKSHOP |
Piping works for plumbing.
Architectural for Living Quarters.
Provide electrical.
Provide system mini HVAC |
3 |
ANGSI-D TOPSIDE (PETRONAS) |
TELOK RAMUNIA FABRICATION YARD |
Piping works
Mechanical works |
YEAR 2007 |
|||
NO |
PROJECT |
LOCATION |
WORK DESCRIPTION |
1
|
W.D.KENT SELF TENDER BARGE (MERMAID OFFSHORE) |
MMHE (MARINE REPAIR) |
Miscellaneous pipe renewal and conversion.
High pressure pipe renewal conversion.
Accommodation pipe renewal and conversion. |
2 |
T.H.208 JACK UP RIG (TANJUNG OFFSHORE) |
MMHE (MARINE REPAIR) |
Miscellaneous pipe renewal and conversion.
High pressure pipe renewal conversion.
Accommodation pipe renewal and conversion. |
3 |
T – 11 SELF TENDER DRILLING BARGE (SMEDVIG) |
MMHE (MARINE REPAIR) |
New piping work for accommodation, Brine system, fire line and other pipe system. |
4 |
FSO ORKID (TALISMAN) |
MMHE (MARINE REPAIR) |
Engine room renewal and conversion.
Accommodation pipe renewal and conversion. |
YEAR 2006-2007 |
|||
NO |
PROJECT |
LOCATION |
WORK DESCRIPTION |
1 |
KEPPEL FELS-JACK UP RIG (KEPPEL FELS) |
TELOK RAMUNIA FABRICATION YARD |
Piping fabrication and installation work jack up rig hull side. |
2 |
BUNGA KEKWA C ANNEX PLATFORM ( TALISMAN ) |
TELOK RAMUNIA FABRICATION YARD |
Provision of man power, tools, consumables and supervision including installation of end closure |
3 |
SC ( F13 E ) DR - A TOPSIDE ( SARAWAK SHELL BERHAD ) |
TELOK RAMUNIA FABRICATION YARD |
Provision of man power, tools and supervision of piping works. Duplex piping 9000 dia inch. |
4 |
BR - A DECK EXTENSION (TALISMAN) |
TELOK RAMUNIA FABRICATION YARD |
Change of piping materials from galvanized carbon steel to stainless steel and supply man power for mechanical work. |
5 |
VASAI BRIDGE (SAMSUNG) |
TELOK RAMUNIA FABRICATION YARD |
Piping works |
6 |
SUMANDAK SELATAN & TEPI (PETRONAS) |
TELOK RAMUNIA FABRICATION YARD |
Piping works.
Architectural works for (SUJT-C & SUPG-B) |
7 |
EAST BELUMUT – A LIVING QUARTERS (NEWFIELD) |
TELOK RAMUNIA FABRICATION YARD |
Piping works for plumbing.
Architectural for Living Quarters. |
YEAR 2006 |
|||
NO |
PROJECT |
LOCATION |
WORK DESCRIPTION |
1
|
FSO CENDOR (MISC) |
MMHE (MARINE CONVERSION) |
Cargo offloading pipe.
Miscellaneous pipe to be renewal. |
2 |
FSO ABU CLUSTER (TALISMAN) |
MMHE (MARINE CONVERSION) |
Accommodation piping work for sanitary and soil system. Portable water, fresh water, hot & cold water system. Modified and lay new pipe. Material, CPVC galvanize pipe and conifer pipe. Engine room miscellaneous, piping renewal.
Supply fire watch
Provide layout and fabrication drawing. |
3 |
T – 10 SELF TENDER DRILLING BARGE (SMEDVIG) |
MMHE (MARINE CONVERSION) |
New piping work for accommodation, Brine system, fire line and other pipe system. |
4
|
SEW HAWK |
MMHE (MARINE REPAIR) |
Refurbish and new installation ballast and miscellaneous pipe. |
5 |
KDU KIKEH SPAR PROJECT (TECHNIP – MURPHY OIL) |
MMHE (ENGINEERING CONSTRUCTION) |
Complete hull piping. |
YEAR 2005 |
|||
NO |
PROJECT |
LOCATION |
WORK DESCRIPTION |
1 |
FSO SOUTH ANGSI – A (TALISMAN) |
MSE (SHIPBUILDING DIVISION)
|
Accommodation piping work for sanitary and soil system. Portable water, fresh water, hot & cold water system. Modified and lay new pipe. Material CPVC galvanize pipe and conifer pipe. |
2 |
FSO SOUTH ANGSI – A (TALISMAN) |
MSE (SHIPBUILDING DIVISION)
|
Provide lay out drawing.
Engine room miscellaneous, piping renewal.
Supply fire-watcher |
3 |
FSO SOUTH ANGSI – A MOAB TOPSIDE PROJECT (TALISMAN) |
MSE (ENGINEERING DIVISION)
|
Provide labours to perform pipe hydro testing |
4 |
FSO SOUTH ANGSI – A (TALISMAN) |
MSE (SHIPBUILDING DIVISION)
|
Provide labours to refurbish piping work for all type of vessel like container vessel, cargo vessel and tanker |
5 |
FHI PROJECT |
MSE - ATB |
Fabricate of 3 nos. vessel. |
6 |
LTH PROJECT |
MSE - ATB |
Fabricate of 5 nos. vessels SS 316 pipe spool. |
7 |
SSB PROJECT |
MSE - ATB |
Fabricate of 1 no. portable water tank |
8 |
SC (F13W) PROJECT |
MSE - ATB |
Fabricate of 1 no. Intelligent Launcher |
9 |
PETRONAS CARIGALI MERCURY REMOVAL SYSTEM (PETRONAS) |
MSE - ATB |
Fabricate of 6 nos. vessel (thickness 114mm) |
10 |
OVERSEAS MANUFACTURING (JOHOR) SDN. BHD |
TEBRAU JOHOR |
Provide supervision and labours to carry out LPG Spherical Tank.
Provide supervision and labours to carry out pressing, cutting and bevelling. Fabrication of platform, install at nozzle manhole.
Provide skill labours.
Additional works.
Provide supervision and labours to carryout bending plate, marking and cutting hemi head V – 310
Supply labours.
Supply labours perform pressing and fabrication work for entire VCM Spherical tank ( BT – 0003A ) |
YEAR 2004 |
|||
NO |
PROJECT |
LOCATION |
WORK DESCRIPTION |
1
|
ATB |
MSE |
Fabricate of 3 nos. vessel for BS & B project.
Fabricate of 1 no closed drain tank for Baobab.
Fabricate of 7 nos. of BSB Vessel.
Fabricate of 4 nos. of SSB SC pig & Receiver.
Fabricate of 4 nos. of SSB E – 11 Pressure Vessels.
Fabricate of 6 nos. of Templates for FHI Vessel Project.
Fabricate of 3 nos. of UOP Absorber Vessel |
YEAR 2003-2004 |
|||
NO |
PROJECT |
LOCATION |
WORK DESCRIPTION |
1
|
YOHO FSO CONVERSION (SBM & EXXONMOBIL) |
MSE (SHIPBUILDING DIVISION)
|
Accommodation piping work for sanitary and soil system. Portable water, fresh water, hot & cold water system. Modified and lay new pipe. Material CPVC galvanize pipe and conifer pipe.
Cargo tank new 14” Ø stripping line. Material KUBOTA PIPE required 100% R.T. Engine room miscellaneous, pipe system modified and reinstall
Provide qualified welder to assist (NORDIC – hydraulic contractor from Singapore) |
2 |
YOHO FSO CONVERSION (SBM & EXXONMOBIL) |
MSE (SHIPREPAIR DIVISION)
|
Provide labours to refurbish piping work for all type of vessel like container vessel, cargo vessel and tanker |
3 |
KIZOMBA - E |
MSE (SHIPREPAIR DIVISION) |
Provide labours to perform pipe hydro testing |
YEAR 2003 |
|||
NO |
PROJECT |
LOCATION |
WORK DESCRIPTION |
1
|
ATB |
MSE
|
Fabricate of 4 nos. of Vessel for JE/Petrobas Reduce
Fabricate of 2 nos. of Elevated Water Tank For LUNDIN |
2 |
ATB |
MSE |
Fabricate of 6 nos. vessel for Petronas CarigaliSdn. Bhd (Penara& North Lukut Development Project)
Fabricate of 6 nos. Launcher/Receiver for Petronas CarigaliSdn. Bhd. (Penara& North Lukut Development Project)
Fabricate of 1 no of Drain Tank for Su Tu Den SOFEC
Fabricate of 4 nos. of Vessel for ATB/Petronas Replant
Fabricate of 6 nos. of Tote Tank Frames for LUNDIN |
YEAR 2001-2002 |
|||
NO |
PROJECT |
LOCATION |
WORK DESCRIPTION |
1
|
ROSE SEA (FSO)
|
MSE (SHIPBUILDING DIVISION)
|
Labour supply piping workers to SHIPREPAIR DIVISION for all repair ship including ROSE SEA (FSO) and BUNGA KERTAS (FPSO)
Installation of Fire & Foam line 7C cargo ballast & stripping line for ROSE SEA
Installation of tank ballast system and heating coil for BUNGA KERTAS |
2 |
BUNGA KERTAS (FPSO) |
||
3 |
FPSO BUNGA KERTAS (MISC) |
MSE (SHIPBUILDING DIVISION)
|
Provide supervision and labours to carry out additional and new installation tank gauging pipe.
Labour supply to assist MSE staff for commissioning and final connection pipe work.
Install diesel oil pipe. |
4 |
TENDER BARGE T-9 (SMEDVIG) |
MSE (SHIPBUILDING DIVISION)
|
Provide supervision and labours to carry out new installation piping work for new build Tender Barge T-9 |
YEAR 2000-2001 |
|||
NO |
PROJECT |
FABRICATOR’S/ CLIENT ‘S NAMES |
WORK DESCRIPTION |
1
|
-SELF DRILLING TENDER BARGE T-6, (SMEDVIG) |
MSE (SHIPBUILDING DIVISION)
|
Provide supervision and labours to carry out piping work for upgrading and conversion. |
2 |
-SELF DRILLING TENDER BARGE T-3, (SMEDVIG) |
|
|
3 |
-SELF DRILLING TENDER BARGE T-2. (SMEDVIG) |
|
|
4 |
PAPER PULP PLANT PHASE 2 PASIR GUDANG |
HARTMANN MALAYSIA SDN. BHD.
|
Provide supervision pipe fitter and TIG welder to fabricate and install complete plant piping system. Material stainless steel and carbon steel.
To testing and offer to client acceptance.
Provide machinery fitter and rigger to install conveyer hot air ducting and other equipment for new plant.
Provide labours and material to insulate hot water ducting, material Rockwool density 110kg/m3 and aluminium sheet for cladding.
Provide labours and material to fabricate egg tray container. |
5 |
NAVY SHIP (K.D.SRI INDERAPURA) |
MSE (SHIPREPAIR DIVISION) |
Provide supervision and labours to carry out additional tank gauging tubing for crude oil tanker total 4000 meter height.
Refurbish piping work - Fuel Oil and Lube Oil System. - Ballast line, seawater line and fresh water line; all pipe remove and flanges for access. All materials are CUNIFER pipe. - - Complete accommodation pipe system, material CUNIFER pipe, remove and add flange joint at certain area for access.
Labour supply piping workers for SHIPREPAIR DIVISION |
6 |
VLCC AL-FUNTAS |
MSE (SHIPREPAIR DIVISION)
|
Provide supervision and labours to carry out pipe renewal.
Deck IGS bunker line, Foam line, Fire line complete renewal.
Labour supply for piping workers for SHIPREPAIR DIVISION. |
YEAR 1999-2000 |
|||
NO |
PROJECT |
FABRICATOR’S/ CLIENT ‘S NAMES |
WORK DESCRIPTION |
1 |
MASA (TRENERGY FPSO) |
MSE (ENGINEERING DIVISION)
|
Provide supervision and labours to carry out piping work
Fabricate and install tank heating coil, material aluminium brass.
Fabricate and install Deluge water system, material stainless steel.
Fabricate and install cargo loading system at turret platform.
All pipe system above are required 100% R.T inspection
Supply labours to carry out hook up work at offshore
Supply and delivery WASTE COMPACTOR to TRENERGY import from SWEEDEN.
Supply gymnasium set and dining set to TRENERGY |
2 |
-SELF DRILLING TENDER BARGE CHARLEY GRAVE (TRANSOCEAN) |
MSE (SHIPBUILDING DIVISION)
|
Provide supervision and labours to carry out piping work renewal and conversion.
|
3 |
-SELF TENDER BARGE T-4 (SMEDVIG) |
|
|
4 |
-SELF DRILLING TENDER BARGE PIRANHA |
|
|
YEAR 1997-1998 |
|||
NO |
PROJECT |
FABRICATOR’S/ CLIENT ‘S NAMES |
WORK DESCRIPTION |
1 |
PAPER PULP PLANT PHASE 1 PASIR GUDANG |
HARTMANN MALAYSIA SDN. BHD.
|
Provide supervision pipe fitter and TIG welder to fabricate and install complete plant piping system. Material stainless steel and carbon steel.
To communicate with client for proposing of laying pipe before fabrication.
To testing and offer to client acceptance |
2 |
699 TEU CONTAINER VESSEL (MISC) |
MSE (SHIPBUILDING DIVISION)
|
Provide supervisor and labours to fabricate, install testing engine room and accommodation piping work for 2 unit container vessel.
All ballast system valve operate air material using multicore stainless tubing.
Provide labours and material to do insulation work for exhaust system, steam system and other pipe which working temperature above 70°c |
YEAR 1996-1997 |
|||
NO |
PROJECT |
FABRICATOR’S/ CLIENT ‘S NAMES |
WORK DESCRIPTION |
1 |
STANDBY UTILITY TUG, (BUMI ARMADA) |
MSE (SHIPBUILDING DIVISION)
|
Provide supervisor and labours to assist existing contractor to complete piping work. |
YEAR 1995-1995 |
|||
NO |
PROJECT |
FABRICATOR’S/ CLIENT ‘S NAMES |
WORK DESCRIPTION |
1 |
SUPPLY LABOURS |
MSE (SHIPREPAIR DIVISION)
|
Provide labours to refurbish piping work for all type of vessel like container vessel, cargo vessel and tanker. |
2 |
8000 DWT CHEMICAL TANKER (MISC) |
MSE (SHIPBUILDING DIVISION)
|
Provide labours to fabricate, install and testing complete piping works.
All cargo system, tank heating coil are using stainless steel pipe material.
All cargo pumps operate by FRAMO HYDRAULIC STSTEM which material using stainless steel pipe and working pressure 120bar.
Provide labours to do insulation work for exhaust system heating coil and other pipe which working temperature above 70°c |